A list for Azalea (Preliminary)

Here’s a non-exhaustive list of things we (Azalea and QQ) may prepare for this meeting:

– Define a list of people you would like Azalea Li Suen WEE to meet. Think of team members, key collaborators, and important stakeholders of their future tasks.

To Meet Office colleagues: 

o Kit Ping (Dep Secretary,
o Khoo (section manager of Process), 
o Hock Chye (section manager of Quality) and
o Bala (Dep HOD)

Introduce to all Process Owner team and 

Some Shift Engineer including (first time join morning AVP WK40.5)

o Yen Nee and 
o Yee Han

Co-work function party: 

o Fong Eng CHANG (production manager)  
o Shy Ching (Industrial Engineering implant coordinator)

– Organize several tasks for Azalea Li Suen WEE to get them started in their new position.

o STM Ang Mo Kio Tour (Office Building and Fab Building) => NFC Check-In Point WK40
o Major Tool Type location
o File system of STM Daily Task (T-drive, Common folder, working file/folder)

– Plan time for all mandatory trainings that Azalea Li Suen WEE needs to complete.

o FAB SAFTY/ ESH/IMPL evacuation gathering points (WK40)
o FAB SAFTY/ PPE and Eye shower point (WK40)
o FAB SAFTY/ Fab Hazard and Safety (WK40)
o Semiconductor/ Semiconductor Physic and Fab Process training (WK41~42)
o Semiconductor/ Implant Process training (WK43-44)
(1) Participation: Small project assisting(WK44) : Rs measurement
o Semiconductor/ Device/ MOSFET training and Basic application (WK43-44)
o Semiconductor/ Device/ MOS transistor Source and Drain implantation (WK43-44)
o Quality/ Yield and Reliability Quality Control system (WK45)

o  
o Quality/ SPC control (Math of statistic knowledge and application) (WK45-46)
(2) Participation: Small project handling (WK46) : Tool Matching (data to graphic transferring)
o Quality & Robustness & Sustainable Manufacturing/ Process Control, Recipe Control and Change Control (Pcomp% application) (High Math skill for data analysis with Excel, Convolution operation…) (WK46-48..50)
o Quality & Robustness & Sustainable Manufacturing/ Process KPI design and Deployment (WK48-52)
(3) Participation: Project assisting (WK48..50) 

2024 Year End Reviewing and Master Plan discussion

 

2025 New stage: (plan to deploy some control plan: EMER Aperture Current, Disk Positive Charge, Cryo Pump Temperature)

Data Access: implant process data analysis assisting for:

a. Machine eStar alarm (excel skill)
b. Schedule test failure (short loop simulation and defect detection)
c. Process lot HOLD and Impact (start to justify correlation and commonality)

Data analysis: Math/statistic; Methodology; common math tools

a. Correlation-ship (excel based Pearson Rmethod, flat-zone design and verify)
b. Reproduce (factor impact repeat, flat-zone application)
c. Detection (KPI design, data sample distribution category & SPC or CLM Control)

PDCA: Engineering problem solving skill

a. Problem definition
b. Penetrate 
c. Fertilization
d. Solution

            

– Allow enough time to check in with Azalea Li Suen WEE during the first couple of weeks. Schedule regular check-ins to provide feedback and ensure they are on track.

Every two days presentation (one on one with me, not daily update, 5mins)

Bi-weekly presentation (in meeting room, with given topic, 10~15mins)

Monthly progress and project review (one on one with me)

                      (all need prepares Power Point slides)