A list for Azalea (Preliminary)

Here’s a non-exhaustive list of things we (Azalea and QQ) may prepare for this meeting:

– Define a list of people you would like Azalea Li Suen WEE to meet. Think of team members, key collaborators, and important stakeholders of their future tasks.

To Meet Office colleagues

Kit Ping (Dep Secretary,
Khoo (section manager of Process), 
Hock Chye (section manager of Quality) and
Bala (Dep HOD)

Introduce to all Process Owner team and 

Some Shift Engineer including (first time join morning AVP WK40.5)

Yen Nee and 
Yee Han

Co-work function party

Fong Eng CHANG (production manager)  
Shy Ching (Industrial Engineering implant coordinator)

– Organize several tasks for Azalea Li Suen WEE to get them started in their new position.

STM Ang Mo Kio Tour (Office Building and Fab Building) => NFC Check-In Point WK40
Major Tool Type location
File system of STM Daily Task (T-drive, Common folder, working file/folder)

– Plan time for all mandatory trainings that Azalea Li Suen WEE needs to complete.

FAB SAFTY/ ESH/IMPL evacuation gathering points (WK40)
FAB SAFTY/ PPE and Eye shower point (WK40)
FAB SAFTY/ Fab Hazard and Safety (WK40)
Semiconductor/ Semiconductor Physic and Fab Process training (WK41~42)
Semiconductor/ Implant Process training (WK43-44)
(1) Participation: Small project assisting(WK44) : Rs measurement
Semiconductor/ Device/ MOSFET training and Basic application (WK43-44)
Semiconductor/ Device/ MOS transistor Source and Drain implantation (WK43-44)
Quality/ Yield and Reliability Quality Control system (WK45)

 
Quality/ SPC control (Math of statistic knowledge and application) (WK45-46)
(2) Participation: Small project handling (WK46: Tool Matching (data to graphic transferring)
Quality & Robustness & Sustainable Manufacturing/ Process Control, Recipe Control and Change Control (Pcomp% application) (High Math skill for data analysis with Excel, Convolution operation…) (WK46-48..50)
Quality & Robustness & Sustainable Manufacturing/ Process KPI design and Deployment (WK48-52)
(3) Participation: Project assisting (WK48..50) 

2024 Year End Reviewing and Master Plan discussion

 

2025 New stage: (plan to deploy some control plan: EMER Aperture Current, Disk Positive Charge, Cryo Pump Temperature)

Data Access: implant process data analysis assisting for:

a. Machine eStar alarm (excel skill)
b. Schedule test failure (short loop simulation and defect detection)
c. Process lot HOLD and Impact (start to justify correlation and commonality)

Data analysis: Math/statistic; Methodology; common math tools

a. Correlation-ship (excel based Pearson Rmethod, flat-zone design and verify)
b. Reproduce (factor impact repeat, flat-zone application)
c. Detection (KPI design, data sample distribution category & SPC or CLM Control)

PDCA: Engineering problem solving skill

a. Problem definition
b. Penetrate 
c. Fertilization
d. Solution

            

– Allow enough time to check in with Azalea Li Suen WEE during the first couple of weeks. Schedule regular check-ins to provide feedback and ensure they are on track.

Every two days presentation (one on one with me, not daily update, 5mins)

Bi-weekly presentation (in meeting room, with given topic, 10~15mins)

Monthly progress and project review (one on one with me)

                      (all need prepares Power Point slides)